For UK contractors and housebuilders

Construction site management software comparison (UK)

Compare Collabor8online Site Manager with The Site Book, Insite, innDex, Procore and Trimble Field View. Choose the site priorities that matter to your projects, review the documented capabilities and see what to ask each supplier to demonstrate.

Powerful construction software. Personal UK support.

UK-owned, UK-hosted and UK-supported. Big enough to handle your requirements, small enough to care. We help UK contractors adopt configurable site processes with a team they can speak to.

Prepared by the Collabor8online team · Supplier information reviewed 3 November 2026. This is our supplier comparison, based on public product information; capabilities and prices depend on the product, package and agreed setup.

Start with the work your sites need to manage

Why shortlist Collabor8online? Site Manager brings subcontractor records, RAMS, inductions, site sign-in and day-to-day site processes into a configurable environment for UK contractors and housebuilders. Choose the modules around your sites, then use a demonstration to check the complete process.

These products cover different combinations of site operations and project management. Use this overview to orient your shortlist, then compare your priorities below. The supplier summaries include the package questions and source links.

Six suppliers at a glance
SupplierProduct focusPackage basisQuestion to ask
Collabor8onlineProduct focusConfigurable site operations for UK contractors and housebuilders.Package basisFour Site Manager package levels; quotation for your sites, modules and configuration.Question to askWhich site controls and forms do we need, and is Drawing Management also required?
The Site BookProduct focusConstruction safety-document creation with site records and Site Control workflows.Package basisBusiness is priced per account; Site Control per active site.Question to askDo we need document drafting as well as attendance and contractor records?
InsiteProduct focusQuality, site records and configurable forms, with workforce and drawing tools.Package basisStarter, Premium and Premium Plus packages; confirm current pricing and user/project allowances.Question to askDoes the quote include Workforce Management and the drawing controls we require?
innDexProduct focusSite workforce, access, safety and operational records.Package basisRequest a quotation for the required modules and site setup.Question to askWhich capabilities are native, and which depend on hardware or a connected CDE?
ProcoreProduct focusConstruction project management, field coordination and project information.Package basisAnnual quote based on selected products and Annual Turnover; Field Productivity uses an FTE basis.Question to askWhich purchased products cover our field, workforce and project-information workflows?
Trimble Field ViewProduct focusField inspections, forms, tasks and construction quality records.Package basisQuoted Lite and full packages, with different user and implementation allowances.Question to askWhat is included in Field View, and what needs another Trimble product or integration?

Formal drawing revision control and the RFI workflow compared for Collabor8online are supplied through the separate Drawing Management product. Site Manager and Drawing Management can be used together; confirm the modules and access arrangement in your quotation.

Compare your site priorities and see how Collabor8 fits

Choose the areas you want to improve. Every comparison includes Collabor8online and the same five suppliers. Your choices filter the detailed comparison and build a Collabor8 demonstration agenda.

What do you want more control over?

Site access and People and RAMS are selected to get you started. Change them to suit your projects.

Compare the capability and the package

The full comparison is available below. Documented means the cited supplier information describes the capability. Confirm scope means the exact workflow, package or integration needs checking; it does not mean the supplier cannot provide it. Collabor8’s column is highlighted so you can follow its scope.

Illustrative Collabor8online Site Diary on a laptop, showing attendance, daily updates, photographs and documents.
Read the complete capability comparison

Scroll across to see every supplier. Priority labels and column headings stay visible inside the table.

Sources reviewed 3 November 2026. Ask each supplier to show the same site scenario and confirm the relevant package.

Site priorityCollabor8onlineThe Site BookInsiteinnDexProcoreTrimble Field View
Site accessCollabor8onlineSite Manager

Digital inductions, operative records and QR or shared-device sign-in, with a live attendance view and configured approval requirements.

Source 1 Source 2
The Site BookDocumented

Site Control advertises QR entry, induction requirements, credential checks and attendance records.

Source
InsiteDocumented

Workforce Management links induction completion, QR/kiosk/mobile sign-in and live attendance.

Source
innDexDocumented

Digital site inductions, workforce time capture and access-control options are documented.

Source 1 Source 2 Source 3
ProcoreConfirm scope

Mobile and web timesheets document labour-time capture; dedicated worker induction and physical access-control scope requires confirmation.

Source 1 Source 2
Trimble Field ViewConfirm scope

A dedicated worker-induction, attendance or physical access-control module was not verified for Field View.

Source
People and RAMSCollabor8onlineSite Manager

Subcontractor RAMS submission and review, operative acknowledgements, and toolbox talks with individual completion records.

Source 1 Source 2
The Site BookDocumented

RAMS creation, subcontractor evidence, certificate tracking and toolbox-talk sign-off; plan scope applies.

Source 1 Source 2
InsiteDocumented

Workforce Management documents subcontractors and version-specific RAMS acknowledgement; toolbox talks are also advertised.

Source 1 Source 2
innDexDocumented

RAMS briefing and sign-off, approval records, briefings and toolbox-talk modules are documented.

Source 1 Source 2
ProcoreConfirm scope

Safety documents and checklists are supported; a complete RAMS submission, approval and worker briefing/sign-off workflow requires confirmation.

Source 1 Source 2
Trimble Field ViewConfirm scope

Configurable toolbox-talk forms are documented; dedicated subcontractor RAMS submission, review and briefing/sign-off scope requires confirmation.

Source
Safety and permitsCollabor8onlineSite Manager

Configured safety inspections, incident records, permit processes and assigned follow-up actions.

Source 1 Source 2
The Site BookDocumented

Permits, incidents and inspections with assigned corrective actions and retained project records.

Source
InsiteDocumented

Permits, safety checks, toolbox talks and incident records; custom workflows depend on plan.

Source 1 Source 2
innDexDocumented

Digital permit requests, review, expiry alerts and closure sit alongside inspection, observation and incident modules.

Source 1 Source 2
ProcoreConfirm scope

Safety inspections, observations, incidents and records are documented; a dedicated permit-to-work lifecycle requires confirmation.

Source 1 Source 2
Trimble Field ViewConfigurable workflow

Configurable permit, inspection and safety forms, toolbox talks and controlled field workflows are documented.

Source
Quality and snagsCollabor8onlineSite Manager

Quality inspections and snag records connect photographs, drawing mark-ups, assigned actions and recorded outcomes.

Source 1 Source 2
The Site BookConfirm scope

Inspections include action owners, deadlines and completion records. Confirm the required snagging and quality workflow.

Source
InsiteDocumented

QA checks, snagging and defects are advertised, with additional custom workflows in Premium.

Source
innDexDocumented

Quality checklists and a snagging module are documented.

Source 1 Source 2
ProcoreDocumented

Inspections, assigned snag items, photos and closure records are documented.

Source 1 Source 2
Trimble Field ViewDocumented

Tasks and snagging can be located on site information, assigned to teams or subcontractors and closed with evidence.

Source
Plant and equipmentCollabor8onlineSite Manager

Registers for company and subcontractor plant, checks and inspections, equipment requests, deliveries and off-hire notifications.

Source
The Site BookDocumented

Business and above provide equipment registers, project allocations, evidence, inspections and defects.

Source
InsiteConfirm scope

M&E asset records and commissioning history are documented. Confirm construction plant registers and inspection scope.

Source
innDexDocumented

Plant and vehicle inventory, usage, checks, maintenance and certification records are documented.

Source
ProcoreDocumented · check package

The Equipment tool documents tracking site equipment and arrivals/departures, status and pickup activity. Confirm availability, contracted product and the maintenance, rental and cost-management functions required. Do not treat a beta label on an individual equipment feature as a beta label for the whole tool.

Source
Trimble Field ViewConfirm scope

Dedicated fleet, plant usage, maintenance or plant-hire management was not verified for Field View.

Source
Materials and deliveriesCollabor8onlineSite Manager

Material requisitions retain the request, review decision, supply arrangements and delivery information.

Source
The Site BookConfirm scope

Site diaries capture deliveries. Confirm material requisitions, purchasing approvals and receipt-matching requirements.

Source
InsiteConfirm scope

Site diaries record deliveries. Confirm any required requisition, approval and goods-receipt process.

Source
innDexConfirm scope

Digital delivery notes are documented; full requisitioning and stock control require confirmation.

Source 1 Source 2
ProcoreBeta · confirm availability

The Materials tool documents requests, receipts, issuing, inventory and delivery information; its official support documentation marks it as beta. Confirm UK availability, eligibility and contracted scope before treating it as a generally available included feature.

Source
Trimble Field ViewConfirm scope

A dedicated materials requisitioning, inventory and deliveries module was not verified for Field View.

Source
Part L evidenceCollabor8onlineSite Manager

Project- and plot-based evidence records organise construction-stage photographs and supporting documents for review.

Source
The Site BookConfirm scope

Confirm plot-level Part L evidence capture, required photo details and reporting with the supplier.

Source
InsiteDocumented use case

Part L/BREL evidence collection and reporting are documented in a housebuilder case study; confirm package and workflow.

Source
innDexConfirm scope

A dedicated Part L evidence workflow was not verified in the reviewed official sources.

Source
ProcoreConfirm scope

A dedicated Part L evidence workflow was not verified in the reviewed official sources.

Source 1 Source 2
Trimble Field ViewConfigurable workflow

Trimble explicitly describes Part L evidence capture using photos with time/location information and configured forms.

Source
Daily site recordsCollabor8onlineSite Manager

Site diary records combine recorded attendance with updates, progress photographs and explanations of delays.

Source
The Site BookDocumented

Daily project records cover site activity, weather, visitors, deliveries, issues and photographs.

Source
InsiteDocumented

Diaries capture labour, plant, deliveries, weather and delays, with searchable records and exports.

Source
innDexDocumented

A native daily-diaries module is documented.

Source
ProcoreDocumented

The UK site-management page describes daily site diary records for activities, conditions and progress.

Source
Trimble Field ViewDocumented

Site diaries document daily activities, conditions, safety and progress.

Source
Drawings and documentsCollabor8onlineDrawing Management — separate product

Controlled drawings and documents with revision history, permissions, distribution records and supported approval workflows.

Source
The Site BookConfirm scope

Site Files shares drawings and plans; the vendor distinguishes this from formal drawing revision control.

Source
InsiteConfirm scope

Drawing version histories and visual comparison are advertised; confirm register and transmittal availability.

Source 1 Source 2
innDexIntegration / scope

innDex documents CDE integrations with Asite and Procore; native drawing revision management needs confirmation.

Source
ProcoreDocumented

Native drawing tools support the current drawing set, previous revisions, mark-ups and mobile access.

Source 1 Source 2
Trimble Field ViewDocumented

Native Field View drawing tools support uploading new revisions and updating assigned locations.

Source 1 Source 2
RFIsCollabor8onlineDrawing Management — separate product

Raise and assign project queries, retain responses and follow action status within supported Drawing Management packages.

Source
The Site BookDocumented

RFIs are included in Site Control. Confirm the detailed routing, reporting and package.

Source 1 Source 2
InsiteDocumented

RFI and technical-submittal tracking includes assigned owners, due dates and retained responses.

Source
innDexConfirm scope

A dedicated native RFI workflow was not verified in the reviewed official sources.

Source 1 Source 2
ProcoreDocumented

A dedicated RFI workflow supports creation, responses, follow-up, reminders, history and links to project documents.

Source
Trimble Field ViewConfirm scope

A dedicated RFI workflow was not verified specifically for Field View.

Source
Project visibilityCollabor8onlineSite Manager

Authorised teams can review relevant records across multiple projects, including available safety reporting and dashboards.

Source 1 Source 2
The Site BookDocumented

Shared job records, attendance and evidence support management of several projects; check reporting requirements.

Source
InsiteDocumented

Attendance and workforce records span projects; company-level reporting depends on the selected plan.

Source 1 Source 2
innDexDocumented

Project and company reporting provide project metrics and visibility across projects.

Source 1 Source 2
ProcoreDocumented · check package

The platform provides visibility and consistent project processes across a portfolio.

Source 1 Source 2
Trimble Field ViewDocumented

Reporting, dashboards and standardised processes support visibility and audit records across projects.

Source
Your processesCollabor8onlineSite Manager

Company forms and site processes can be accommodated through agreed configuration, backed by a UK-owned, UK-hosted business and a UK-based support team. We focus on the individual contractor's requirements rather than assuming every site operates in the same way.

Source 1 Source 2
The Site BookConfirm scope

Reusable project templates are documented. Confirm any bespoke form, permission or approval requirements.

Source
InsiteDocumented

Form Builder supports custom fields, recurring checks, assigned users, approval steps and project-specific settings.

Source
innDexDocumented

Existing processes and forms can be digitised, with configurable RAMS and permit approval workflows.

Source 1 Source 2 Source 3
ProcoreDocumented · check package

The platform documents configurable workflows, fields and views that can be applied across projects.

Source
Trimble Field ViewDocumented

Custom forms, checklists, task sequences and workflow automation are documented.

Source

Which supplier belongs on your shortlist?

Use the scope below to prepare your conversations. Compare the products and modules you would actually purchase, including implementation and support.

Collabor8online

Put Collabor8online on your shortlist when you want subcontractor records, RAMS, inductions, site sign-in and everyday site processes to work together around your company’s requirements.

Package and pricing: Basic Site Access and Sign In; Subcontractor Management; Site Compliance Management; Fully Managed Site Operations. Drawing Management is a separate, additional product.

Before choosing: Bring an existing site form. Agree the modules, responsibilities, support, training and total price for your proposed setup.

The Site Book

Consider it where creating RAMS, CPP and COSHH documentation is part of the buying requirement, alongside managing project evidence and site activity.

Package and pricing: The supplier pricing page checked on 3 November 2026 lists Site Control at £675 per active site per month plus £5,000 one-off setup, with unlimited workers and volume pricing for multiple sites. Business is a separate, account-priced plan. Confirm the current quotation, VAT treatment and included services with the supplier.

Before choosing: Confirm the relevant plan, any optional setup service, VAT treatment and the workflow your team needs.

Insite

Consider it for organising inspections, snagging, evidence and reporting across site teams. Its public material also describes workforce processes and document version histories.

Package and pricing: Confirm the current Starter, Premium or Premium Plus price and the user/project allowances with Insite. Workforce Management is listed as an optional Premium add-on or included in Premium Plus; do not assume inductions, RAMS and sign-in are included in Starter.

Before choosing: Confirm onboarding, project/user allowances and availability of the required register and transmittal functions.

innDex

Consider it where workforce information, site access and site operations are central to the project. Assess the actual combination of software, hardware and integrations proposed.

Package and pricing: Agree the modules and implementation in the quotation. CDE integrations should be scoped with the connected supplier as well.

Before choosing: Demonstrate your drawing and RFI process end to end and confirm which system holds each record.

Procore

Consider it when the buying requirement spans construction project management and collaboration across office and field teams, including drawings and RFIs.

Package and pricing: Annual contracts are priced by selected products and Annual Turnover, described by Procore as aggregate construction value. Field Productivity uses full-time equivalents. Confirm the purchased products and implementation charges.

Before choosing: Include onboarding, required integrations, attendance arrangements and the reports your team needs in the demonstration.

Trimble Field View

Consider Field View for digitising site forms, recording inspections and managing actions. Scope it as a specific product within the wider Trimble offering.

Package and pricing: Field View Lite supports up to 10 users with remote setup and training. The full Field View package advertises unlimited users and assisted implementation. Both are quoted; confirm the included tools and implementation charges.

Before choosing: Use the same site-entry, materials and drawing scenarios to confirm the proposed forms, controls and integrations.

A connected process in Collabor8 Site Manager

Follow the briefing through to the operative’s record

A site manager chooses a toolbox talk and the relevant subcontractor contracts. Each eligible operative has an individual completion record, so the manager can review who has acknowledged the briefing and who still needs to act.

  1. Issue the relevant briefing.
  2. Record each operative’s acknowledgement.
  3. Review completed and outstanding recipients.
  4. Apply the configured sign-in requirement.

Where enabled, an outstanding live toolbox talk can prevent digital sign-in until completion. Ask us to demonstrate the required setup using a process from your sites.

Illustrative toolbox talk workflow showing distribution and individual completed or outstanding records.

Illustrative example of the toolbox talk workflow. Request a demo to see the current software and the configuration for your sites.

Follow one RAMS submission from subcontractor to operative

Use the same practical scenario in each demonstration. Collabor8online documents the following process within Site Manager; the controls depend on the agreed modules and configuration.

  1. Submit: an invited subcontractor uploads RAMS against the relevant project.
  2. Review: your authorised reviewer makes and records the review decision.
  3. Acknowledge: relevant approved RAMS can be included in an operative’s induction for review and acknowledgement.
  4. Check the record: ask to see the recorded submission, decision and acknowledgement, plus any configured digital sign-in checks.

A digital acknowledgement records completion of that step; it does not replace your team’s assessment, briefings or supervision. This is a documented workflow example, not a claim of independent product testing.

Customer example: project documentation at Guildcrest

Our published Guildcrest Group case study describes organising project information by folder and plot, giving subcontractors access to the relevant documents and assembling handover information.

“We are extremely happy with the backup we’ve had.”

Paul Rose

The Guildcrest Group

This case study concerns project documentation and sharing. It is not evidence that Guildcrest uses every Site Manager module, or a comparison test of the suppliers listed here.

Compare the complete setup for your sites

Give each supplier the same number of sites, users and required processes. Ask for a clear first-year total and the ongoing charge, then check these points together.

Modules and products

Which capabilities are included, configured separately or provided by another product?

Sites and users

What happens when you add a project, subcontractor or member of staff?

Setup and training

Who configures the forms, imports records and helps your teams get started?

Working on site

Demonstrate the phones, shared devices, signal conditions and access arrangements you actually use.

Records and reporting

Show the reports, permissions and export needed by your site and office teams.

Commercial terms

Confirm setup charges, support, contract term, renewals and the scope behind the quoted price.

For Collabor8online, start with the Site Manager package options. If controlled drawings or RFIs are part of the requirement, also review Drawing Management and agree its separate scope.

Questions to settle before you choose

Are all the listed Collabor8 capabilities in one package?

No. Site Manager’s modules, controls and reporting depend on the selected package and configuration. Formal drawing control and the verified RFI workflow in this comparison belong to the separate Drawing Management product. We will confirm the products and setup in your quotation.

Can Site Manager work alongside Drawing Management?

Yes. Each product has a distinct role. Site Manager manages operational site records; Drawing Management controls project drawings and documents. The current one-way link lets authorised Site Manager users open selected drawings and files from a linked Drawing Management project.

How should we use this comparison in a demonstration?

Choose a process from a real project, then ask each supplier to show it from the first action to the final record. Confirm the people, permissions, modules and reports involved. A familiar example is more useful than assuming that similar feature names mean identical workflows.

How this comparison was prepared

Published by Collabor8online, the supplier of Site Manager and the separate Drawing Management product. Contact our team with questions or suggested corrections. Product images labelled illustrative are marketing examples, not independent test evidence.

Prepared by the Collabor8online team using public supplier product, pricing and customer-case-study information reviewed on 3 November 2026. Links beside material claims let you check the source. This is a supplier-authored guide, not independent product testing. Prices and capabilities can change; confirm the current quotation and demonstrate the required configuration. An unverified detail is labelled for confirmation, never treated as a missing feature.

Illustrative Collabor8online site induction settings on a tablet, showing site rules, RAMS and operative approval controls.

Illustrative site induction settings. Available controls depend on the selected modules and configuration.

Bring the site process that causes your team the most chasing

Show us the form, briefing or site record you want to improve. We’ll demonstrate the relevant Collabor8 modules and explain the product combination, configuration and package for your projects.